- In Serial No. 5. Eligibility Criteria of the Technical Bid document of NIT No. 42/DTE(UD&PA)/Tech/2025-2026 dated 17th July, 2025, ‘Sub No. i. The manufactures of the lift should be registered as Class – ‘A’ with Central PWD’ is deleted.
- In the Technical Bid document of NIT No. 42/DTE(UD&PA)/Tech/2025-2026 dated 17th July, 2025, the following points should be added as Sl. No. 10 and 11: -
10. Payment Terms: 20% after arrival of materials at the site, and 80% after completion and commissioning of lift.
11. Free Maintenance Period is 2 years from the Date of Commissioning.
All other terms and conditions remain the same.